A standard machine fits most plants, but not all of them. Height-restricted buildings, non-standard power, own-brand branding and ancillary equipment are the four issues that most often delay an order after the sorter itself is ready. We handle those at the drawing stage, before material is cut.
Everything below is agreed in writing before production starts. Nothing is changed on the shop floor without an approved drawing.
White and blue is the standard finish, applied with industrial powder coating. If your plant or brand needs a different colour, send a RAL code and we paint to it during build. Colour changes after the frame is painted are expensive, so this is fixed at order confirmation.
Hopper height, discharge height and platform clearance can be adjusted within the structural limits of each model. Send the plant layout, ceiling height and the height of your existing conveyor or floor pit. We return a dimensioned drawing for approval, then build to that drawing.
Your logo can go on the body panels, the nameplate and the manual cover. Send artwork as AI, EPS or vector PDF; we return a proof showing position and size. No new tooling is needed for standard panel positions, so OEM branding does not add a mould cost.
Machines are built for the supply at the destination, not shipped with a universal setting. Tell us the voltage, phase, frequency and plug type, and send a photo of the nameplate or socket if one exists. Common configurations are covered; anything outside them is reviewed before the quotation is fixed.
A sorter is only as stable as its air supply. We can quote the compressor, receiver tank, dryer and filters together with the machine, sized from its air consumption rather than a rule of thumb. Bucket elevators and conveyors can be matched to the feed and discharge heights at the same time.
EXW, FOB, CIF and DDP are all available. The machine is crated for container loading, and the document set includes the packing list, manual, wiring diagram, warranty card and a copy of the CE certificate. We track the shipment until it reaches your site.
The sequence is the same for a single machine and for a line. The point is to settle the physical fit and the electrical supply before production, when changes are still free.
Yes. Send a RAL code at order confirmation and the frame is powder-coated to that colour during build. Colour is fixed before painting because repainting a finished frame means disassembly.
Yes. You receive a dimensioned PDF showing hopper height, discharge height and platform clearance. Production only starts after you approve that drawing and the configuration sheet.
Yes. Tell us voltage, phase, frequency and plug type at the quotation stage, and send a photo of an existing nameplate or socket if available. The machine is wired for that supply before it leaves the factory.