The largest belt platform in the LA series. Two 1,200 mm belts, 512 nozzles and 9.0 kW give a nominal 5–12 t/h across plastic flake, regrind and mineral product, with carryover quoted at >20:1.
CS-LA1200D is the dual-layer top of the belt range, above the single-belt CS-LA1200. Two 1,200 mm belts run in parallel on one 2,300 kg frame, so one machine covers the tonnage that would otherwise need two single-layer units — 5–12 t/h nominal, at 9.0 kW.
Its 512 nozzles act on product presented flat on the belt rather than in free fall. That is what makes belt geometry suitable for flake, regrind, irregular shapes and abrasive mineral product: the material travels a stable, predictable path in front of the cameras.
The frame measures 2810 × 2000 × 2088 mm, so confirm the floor and access space before ordering. The dual belt is also why capacity is quoted by particle size rather than as a single number.
Plastic flake and regrind, plus mineral product, share the belt platform. Recipes are stored per material and per colour target.
| Model | Type | Belt width | Nozzles | Power (kW) | Weight (kg) | Accuracy | Carryover | Dimensions (mm) |
|---|---|---|---|---|---|---|---|---|
| CS-LA1200D | Dual-layer belt | 1,200 × 2 mm | 512 | 9.0 | 2,300 | ≥99.99% | >20:1 | 2810 × 2000 × 2088 |
| Particle size | Nominal capacity |
|---|---|
| 5 – 15 mm | 5 – 7 t/h |
| 15 – 30 mm | 6 – 10 t/h |
| 30 – 50 mm | 8 – 12 t/h |
Capacity is nominal and rises with particle size because a deeper, coarser bed carries more mass at the same belt speed. Real output depends on material, contamination load and the reject rate required. Power supply is built to the destination voltage.
Two questions decide the choice: the tonnage you must cover, and whether your product is plastic flake, mineral or a mix.
| Model | Type | Capacity (t/h) | Power (kW) | Weight (kg) | Carryover | Best for |
|---|---|---|---|---|---|---|
| CS-LA300 | Single belt | 1.2 – 3 | 1.75 | 550 | >20:1 | Ore, quartz, plastic flake — small lines |
| CS-LA600 | Single belt | 2.5 – 6 | 2.5 | 750 | >20:1 | Mineral, recycled plastic |
| CS-LA1200 | Single belt | 5 – 12 | 6.0 | 1150 | >20:1 | Plastic recycling, high tonnage on one belt |
| CS-LA1200D | Dual-layer belt | 5 – 12 | 9.0 | 2,300 | >20:1 | Plastic and mineral, two belts in one frame |
CS-LA1200D is chosen when two parallel streams must be covered on one frame, or when belt presentation is required for irregular or abrasive product. For a single stream inside 5–12 t/h, the single-belt CS-LA1200 is the lower-cost unit.
Custom frame heights, RAL machine colour, OEM branding and destination-voltage builds are handled through our custom color sorter service.
Ore and recycled plastic arrive coarse, abrasive and uneven in size. A belt keeps the product flat and at a constant distance from the camera, which is what makes 5-50 mm lumps sortable at production tonnage. Mineral duties are quartz, silica sand, bauxite, manganese, feldspar and kaolin; plastic duties are PET bottle flake, coloured PE, mixed regrind and shredded rigid scrap. The same frame serves a quarry pilot line and a recycling plant with a conveyor take-off point. The belt is 1200 x 2 mm wide, set by the conveyor take-off point rather than by the sorter cabinet.
This tier is built for continuous, multi-shift operation where stopping the line is expensive. Tonnage is high enough that a small percentage of carryover becomes a real annual quantity, so the carryover ratio matters as much as the headline capacity. Plan the civil works, air supply and dust extraction before the machine arrives, because retrofitting them around a running line is the costly way to do it. The installed figures are 5-12 t/h, 9.0 kW and 2300 kg in a 2810 x 2000 x 2088 mm frame.
Two site details decide whether the machine performs as specified: a steady, single-layer feed and a clean, dry air supply. A feed that arrives in surges forces the operator to slow the belt or chute, which gives away tonnage that the machine is capable of holding.
At the top of the 5-12 t/h range, an eight-hour shift is 96 tonnes of feed. Running at a realistic 85% utilisation for changeovers, cleaning and grade switches, plan on about 81.6 tonnes per shift. That is the number to compare with your intake, not the peak figure on the specification sheet.
Reject volume is set by your defect load, not by the machine. At a 2% reject rate the sorter removes roughly 240 kg per hour at full rate, and every kilogram of reject carries good product with it. The stated carryover means that for every 10 rejected particles about one good particle goes with them, or about 9.1% of the reject stream by count. On a high-value product that percentage is the number that decides payback, which is why we quote carryover beside capacity rather than in a footnote.
Energy is the smaller cost line. At 9.0 kW installed, the machine draws about 0.75 kWh per tonne at full rate, and roughly 17280 kWh over 300 eight-hour days at 80% load. Compressed air, belt and nozzle wear, and the labour needed to clean the inspection window usually cost more than the electricity, so the maintenance plan in the next section matters more than the motor rating.
The machine arrives as one transport unit and is positioned on a level concrete floor with access to both sides for cleaning and service. Allow for a feed conveyor or hopper at the inlet and two outfeed bins at the outlet; the reject bin must be easy to empty because it fills fastest on a dirty lot. Lifting points are marked on the frame, and the frame weight is 2300 kg, so plan lifting gear and a clear path before delivery rather than after it.
Services are a compressed-air drop at 0.6-0.8 MPa with dry, oil-free air, and a power supply built to the destination voltage and frequency. Commissioning covers mechanical alignment, belt tracking where a belt is fitted, air-pressure setting, a camera calibration on a reference card and a first recipe run on your own material. We ask for 5-10 kg of representative feed in advance so the first recipe is close before the engineer arrives.
A two- to four-hour run with your operator present is part of commissioning: the recipes are tuned to your grades, the operator is trained on the touchscreen and the reject-rate target is agreed before sign-off. Remote support stays connected after commissioning for recipe adjustments as your incoming lots change.
The wear list is short and known. Ejector nozzles, filters on the air line, the inspection window and the lighting module are the parts that need routine attention; on a belt machine the belt itself and its cleaning scraper are added to the list. Nozzles are replaced individually, not as a block, so a failed ejector is a low-cost item rather than a reason to stop the line.
Daily work is cleaning: wipe the inspection window, check the air pressure, empty the reject bin and look at the feed for surges. Weekly work adds a nozzle test from the touchscreen, a check of the camera image against the reference card and a belt-tracking check on belt models. Annual work is the full calibration and a leakage verification on X-ray machines for the HACCP file.
Keep a small spares kit on site: a set of nozzles, an air filter element, a window and an LED module. That kit covers almost every unplanned stop, and the remote support connection lets our engineers read the machine log before a technician is dispatched, so a minor fault does not turn into a week of downtime.
Both quote 5–12 t/h. CS-LA1200 is a single 1,200 mm belt at 6.0 kW and 1,150 kg; CS-LA1200D runs two 1,200 mm belts on one 2,300 kg frame at 9.0 kW. Choose the single belt for one stream, and the dual layer when two parallel streams must be covered without adding a second machine and its footprint.
A belt carries product as a bed, not as a free-falling stream. Coarser product forms a deeper bed at the same belt speed, so 30–50 mm pieces move 8–12 t/h while 5–15 mm flake moves 5–7 t/h. The figures are nominal and confirmed on your sample.
Yes, with separate stored recipes. Plastic flake and mineral product differ in colour contrast and surface texture, so the camera thresholds and ejector timing are set per material. We test both on your samples before you order.
The power supply is customizable to the destination voltage and frequency. The 512-nozzle dual belt needs a larger, clean, dry compressed air supply than a single-belt machine. Send your site details with the enquiry and the quotation will specify both.